Far Western Krasnodar Bypass

Information model of the project "Highway M-4" Don "- from Moscow through Voronezh, Rostov-on-Don, Krasnodar to Novorossiysk. Construction with subsequent operation on a paid basis of the M-4 Don highway - from Moscow via Voronezh, Rostov-on-Don, Krasnodar to Novorossiysk on the site of the Far Western Krasnodar Bypass"

Type of model:
— “Territorial planning model”
— “Engineering model Surveys ”
— “Pre-design model”
— “Design model”

Total length: 51.2 km

Number of artificial structures:
— Bridges and overpasses: 24 pcs, incl. 7 tunnel overpasses
— Culverts: 59 pcs

Utilized software: Autodesk Civil 3D, Autodesk Revit, Autodesk Infraworks, Autodesk3Ds Max, Autodesk Navisworks, S-INFO.

The model was presented at the international exhibition "Intelligent Transport Systems" in St. Petersburg


Krasnodar (new construction)

A new 51km-long bypass road will run through three municipalities of Krasnodar Region and will have grade-separated interchanges with the existing railway and motor roads. The route will start at the junction with the federal highway M-4 Don and end at the junction with the federal highway A-289 between Krasnodar and the A-290 road Novorossiysk - Kerch.

Construction of Western Krasnodar Bypass will divert transit traffic from Krasnodar agglomeration, significantly reducing travel time.

The BIM model provides a 3D visualisation of any element or system of the future road. The model includes four components: a land-use planning model, an engineering survey model, and pre-design and design models, which can be used at different stages of the design development.

Backarrow_back