Information model of the project “Highway M-4 “Don” - from Moscow through Voronezh, Rostov-on-Don, Krasnodar to Novorossiysk. Construction and subsequent operation on a toll basis of the M-4 Don highway - from Moscow through Voronezh, Rostov-on-Don, Krasnodar to Novorossiysk on the section of the far western bypass of Krasnodar"

The model was presented at the International Exhibition "Intellectual Transport Systems" in St. Petersburg

Krasnodar (new construction)

The 51 km long bypass route of the Far Western Bypass will pass through the territories of three municipalities of the Krasnodar Territory: the city of Krasnodar, Dinsky and Krasnoarmeysky districts. The intersection of the new highway with railways and roads is provided at different levels. The beginning of the route is a transport interchange at the junction from the main direction of the federal highway M-4 "Don", the end of the route is a transport interchange at the junction of the federal highway A-289 "Krasnodar - Slavyansk-on-Kuban - Temryuk - highway A-290 Novorossiysk - Kerch". The intersection of the new highway with railways and roads is provided at different levels. When choosing and justifying the bypass option, special attention was paid to the following aspects: the passage of the route at a distance from the existing and planned development of the Krasnodar agglomeration; general reduction of the new transport route in the direction of the Taman Peninsula; the passage of the route outside the zones of transit corridors of oil and gas pipelines; preservation of the existing reclamation irrigation system.

The construction of the Far Western Bypass of Krasnodar will allow transit traffic heading towards the Black Sea coast to be removed from the territory of the Krasnodar agglomeration and will provide motorists with a significant reduction in travel time. A digital information model (BIM) of the object has been created, which visualizes any elements and systems of the object in 3D format.

Model Type

  • "Territorial planning model"
  • "Engineering Research Model"
  • "Pre-design model"
  • "Project model"

Total Length: 51,2 km

Number of artificial structures:

  • Bridges and overpasses: 24 pcs., incl. 7 tunnel-type overpasses
  • Overpass bridges - 6
  • Culverts: 59